summaryrefslogblamecommitdiffstats
path: root/office/ganttproject/slack-desc
blob: 730bdd844dc1ae75dc9b42256e942dcd985a11f7 (plain) (tree)
1
2
3
4
5
6
7
8
9
                        




                                                                             
 
                                                                                    
                                                                            
             
                                                                              

                                                                            


                                                                            

                            
                                                    
# HOW TO EDIT THIS FILE:
# The "handy ruler" below makes it easier to edit a package description.
# Line up the first '|' above the ':' following the base package name, and
# the '|' on the right side marks the last column you can put a character in.
# You must make exactly 11 lines for the formatting to be correct.  It's also
# customary to leave one space after the ':' except on otherwise blank lines.

            |-----handy-ruler------------------------------------------------------|
ganttproject: ganttproject (free tool for project scheduling and management)
ganttproject:
ganttproject: GanttProject is GPL-licensed (free software) Java based, project
ganttproject: management software that runs under the Windows, Linux and Mac
ganttproject: OSX operating systems.
ganttproject: It features a Gantt chart for project scheduling of tasks, and
ganttproject: doing resource management using resource load charts. It has a
ganttproject: number of reporting options (MS Project, HTML, PDF,
ganttproject: spreadsheets).
ganttproject:
ganttproject: Homepage: https://www.ganttproject.biz